Cooling towers for power station
A fierce tornado damaged one of six critical cooling towers at
an Oklahoma power station. The loss of the 115,000 GPM tower
was severely limiting power generation. The hot summer period
was a particular challenge. A speedy solution was essential
and a US$100,000 a day penalty was consequently part of the
contract.
Modular towers
Working to schedule, within eight
days Aggreko assembled a temporary system. This comprised 45
1000 ton modular towers, associated power transformers, power
distribution and piping systems. The unique and patented design
allowed the towers to be located in limited space. The
elevated cold water basin in the design meant no additional pumps
were required.
The benefits to the customer
The installation was a complete
success. The plant was back to normal production within eight
days. Utility consumers were assured of continued power
supply for air conditioning and other services.