Africa Rental Enquiry - English

320 kVA Canopied GHP Genset

Technical Data

320 kVA GENSET
Ambient temperature before derate
Voltage range (50Hz)
Voltage range (60Hz)
UNIT
°C/°F
Volts AC
Volts AC
VALUE
38/100 (50Hz) 45/113 (60Hz)
220-240/380-415
240-277/416-480
CABLE REQUIRED-320kVA,462AMPS @400V
Size
Type
1x240mm2/phase
1 core
PHYSICAL DATA
Length
Width
Height
Weight (without fuel)
Weight (with fuel)
UNIT
m
m
m
kg
kg
VALUE
4.64
1.50
2.57
5679
6520
FUEL CONSUMPTION
100% prime power
75% prime power
50% prime power
UNIT
l/hr
l/hr
l/hr
VALUE
62.7 (50Hz) 66.4 (60Hz)
49.3 (50Hz) 52.2 (60Hz)
33.3 (50Hz) 35.3 (60Hz)
EMISSIONS DATA (@ 100% LOAD)
NOx (Oxides of Nitrogen)
PM (Particulate Matter)
CO (Carbon Monoxide)
HC (Unburnt Hydrocarbons)
UNIT
g/kWhr
g/kWhr
g/kWhr
g/kWhr
VALUE
4.0 (50Hz) 4.0 (60Hz)
0.2 (50Hz) 0.2 (60Hz)
3.5 (50Hz) 3.5 (60Hz)
4.0 (50Hz) 4.0 (50Hz)
NOISE DATA
Sound pressure at 1m
Sound pressure at 7m
UNIT
dBA
dBA
VALUE
73 (50Hz) 73 (60Hz)
65 (50Hz) 65 (60Hz)

Features

Designed and assembled to Aggreko's standards

Bolted, galvanized, alloy steel canopy with lockable doors

Acoustically designed equipment

Fully bunded fuel tank with 120% capacity

Low fuel-level warning sensor in fuel tank

Forklift pockets in base frame and lifting beam on top

Optional 2-point lifting arrangement

Silencer fitted with spark arrestor and rain cap

Control panel mounted inside, viewable through glass door

Range of warnings and shutdowns on control system

Benefits

Safe and reliable operation for rental applications

Provides extra strength, durability and protection

Reduces noise to operate even in even quieter surroundings

Prevents fuel-leakage, keeps site free from hazard

Aids seamless, interruption-free operation of the genset

Lifting beam facilities vertical lifting and placing in tight spaces

Suitable for offshore service applications

Prevents fire and ingress of foreign matter

Prevents unauthorised access without loss of monitoring

Protects generator set from electrical and mechanical damage, helps indentify and rectify faults before they occur

Fully Engineered Power Rental Solutions

Whether you have an existing project that has additional power needs or require a complete turn-key power system, or need power very quickly, Aggreko staff will engineer a cost-effective power solution that's right for your needs. From load size calculations to designing the equipment package, to delivering, installing and commissioning, to operation & maintenance and fuel supply management, Aggreko has the experience and expertise to deliver a complete solution in quick timescales across a diverse range of industries.

Product Information